Monolith Green City

New development in Krtsanisi, Tbilisi · Nadikvari III Street · developer: Monolith Group

Monolith Green City 1 / 5

About the project

Monolith Green City follows the hillside beside Nadikvari 3rd Street. Monolith Group's buildings step across the site, with individual blocks listed at five to twelve storeys and completion dates spanning 2023–2025. Apartments are offered in white-frame condition. Listed amenities include a recreation park, children's and sports areas, running and cycling paths, pools and 245 underground parking spaces. The gallery shows both the overall arrangement and individual buildings.

Photo gallery

Project features

Building

Construction technology
monolithic-frame
Elevator
yes
Infrastructure
recreation park, children's playgrounds, jogging paths, bicycle paths, sports grounds, swimming pools
Parking
underground parking

Apartments

Apartment renovation
white frame
Apartments area
38.1–261.3 m²
Number of apartments
1657

Floor plans

Tap a floor plan to open the details.

Prices by property type

Prices as of 06.10.2026
TypeAreaPrice
1-room apartments48.5–69.7 m²$66 445–$95 489
50.5–70.4 m²$69 185–$96 448
74.5–90.2 m²$102 065–$123 574
120.8–124.5 m²$165 496–$174 300

Complex amenities

Recreation park
Children's playgrounds
Jogging paths
Bicycle paths
Sports grounds
Swimming pools

Location

Nadikvari III Street

Straight-line distances

≈ 1.9 kmTo the centre: Freedom Square
≈ 11.8 kmTo the airport: Tbilisi (TBS)

Calculated from coordinates, not walking or driving routes. The coastline distance is approximate; airport distances use the aerodrome reference point, not the terminal entrance. © OpenStreetMap

Nearest developments

Developments on the map

Compare locations and open development cards on the interactive map.

Open in Google Maps ↗
Smaller pins show nearby catalog developments. Open in Google Maps ↗ Directions ↗

Questions about the development

What is the starting price?

Listed from $66 445. Price as of 06.10.2026. Specific layout prices and availability are confirmed separately.

When are the buildings due for completion?

Block A, Block A, Block B, Block B, Block C: Completed, Q4 2022; Block A, Block B: Completed, Q4 2023; Block A, Block B, Block D, Block D, Block E, Block E, Block G, Block G, Block V, Block V1, Block V2, Block Z, Block A, Block B: Completed, Q1 2025

What finishes are offered?

white frame

How can I start a remote purchase?

Start by choosing an option and requesting its terms. Our guide explains document checks and the purchase process. Property buying guide →

Request about Monolith Green City

We'll send the currently available floor plans, prices and instalment terms for this project.

A consultant will contact you on this number, clarify your request and prepare layouts, prices and purchase terms.

By submitting you agree to the processing of your data under our privacy policy.

Similar projects

Other projects in Tbilisi

Show all →

Collections featuring this project

Loading photo…
Could not load image