New development in Kobuleti · David Aghmashenebeli Ave, 146/148 · developer: Royal Building 2023
1 / 5
Rounded balconies and a stepped upper floor give Royal Building 2023 its distinctive profile. The nine-storey development stands at 146/148 David Aghmashenebeli Avenue in Kobuleti. It offers studios alongside apartments with separate bedrooms, with surface parking at the building. Homes come in white-frame condition, and gas is listed among the utilities. Completion is planned for the fourth quarter of 2026.
Tap a type to open the details.
| Type | Area | Price |
|---|---|---|
| 33.1–40.2 m² | $43 030–$55 476 | |
| 51.8–63.3 m² | $71 484–$87 354 | |
| 83.7 m² | $108 810 | |
| 87 m² | $120 060 |
Layout types shown: 6
No layout types match. Change the filters or send a request.
David Aghmashenebeli Ave, 146/148
Calculated from coordinates, not walking or driving routes. The coastline distance is approximate; airport distances use the aerodrome reference point, not the terminal entrance. © OpenStreetMap
Compare locations and open development cards on the interactive map.
Open in Google Maps ↗Listed from $43 030. Price as of 06.10.2026. Specific layout prices and availability are confirmed separately.
Royal Building 2023: Under construction, Q4 2026
white frame
Start by choosing an option and requesting its terms. Our guide explains document checks and the purchase process. Property buying guide →
We'll send the currently available floor plans, prices and instalment terms for this project.
Other projects in Kobuleti