8 projects · 15 layout types in the catalogue.
Tell us what you are looking for. A consultant will shortlist catalogue options and clarify the terms.
“Villas in Georgia” includes 8 projects and 15 residential layout types without a sold or booked status. This is not the number of available apartments; availability of a specific property needs confirmation. Projects by district: Gonio — 2; Green Cape — 1; Kakhaberi — 1; Makhinjauri — 1; Mtatsminda — 1; Saburtalo — 1; Vake — 1.
Verified starting prices for the selected type begin at $242,280, across 5 of 8 projects. Other types are excluded from this figure; card prices are separately labelled as the whole project minimum. Project starting rates range from $838 to $3,500/m², with a median of $1,384/m² across 6 projects. These rates cover all types, rather than every individual apartment. Published price dates: 2026-07-13 — 2026-10-29. These are price source dates; availability checks and the site build date do not replace them.
3 of 8 developments are fully completed (38%). Completed construction does not establish the apartment’s finishing or readiness to occupy. Announced completion years for unfinished buildings: 2026, 2028. A project may appear in several year selections.
The finishing field lists: black frame — 3; turnkey — 1; white frame — 2. Multiple options in one project can apply to different buildings or offers.
“Villas in Georgia” includes 8 projects and 15 residential layout types without a sold or booked status. This is not the number of available apartments; availability of a specific property needs confirmation.
Verified starting prices for the selected type begin at $242,280, across 5 of 8 projects. Other types are excluded from this figure; card prices are separately labelled as the whole project minimum. Project starting rates range from $838 to $3,500/m², with a median of $1,384/m² across 6 projects. These rates cover all types, rather than every individual apartment. Published price dates: 2026-07-13 — 2026-10-29. These are price source dates; availability checks and the site build date do not replace them.
3 of 8 developments are fully completed (38%). Completed construction does not establish the apartment’s finishing or readiness to occupy. Announced completion years for unfinished buildings: 2026, 2028. A project may appear in several year selections.
The finishing field lists: black frame — 3; turnkey — 1; white frame — 2. Multiple options in one project can apply to different buildings or offers.
Leave your contacts — we'll shortlist and book the right options, with floor plans, prices and instalment terms.